Projects | Automation

PLC-5 to ControlLogix PLC Conversion

PLC 5 TO CONTROLLOGIX PLC CONVERSION PLC 5 TO CONTROLLOGIX PLC CONVERSION PLC 5 TO CONTROLLOGIX PLC CONVERSION

Trindera's highly skilled automation engineers are prepared to assist clients with a Allen Bradley PLC-5 to ControlLogix Conversion. Recently, Allen Bradley PLC-5’s have been declared obsolete and out of support, increasing costs with a decline in available resources. The Trindera team coordinates and prioritizes a mitigation plan based on the needs of your facility, giving our clients the peace of mind that the transition with work with budgets and timelines in mind. 

Benefits of Conversion:

  • Lower conversion time and labor costs
  • Reduced risk by preserving existing field wiring
  • Lower engineering costs
  • Minimize production downtime
  • Full support through the migration process
  • Review of existing PLC-5 systems
  • Reverse engineering
  • FDS proposal that is sympathetic to future expansion
  • PLC-5 to ControlLogix product matching and selection
  • Full migration cost analysis

Market Sector: Automation, Industrial, Mining

Services Provided: Automation Services, Electrical Systems, Control Systems